top of page

Our Services

We design, wire, install, program—and finish the walls to paint-ready, so everything looks built-in.
Our scope covers Audio-Visual and home theatre, wired/wireless networks, security systems, and studio sound build-outs.
We run clean structured cabling (Cat6/6A, coax, and fiber LC/SC/MPO), label to TIA-606, and firestop every penetration.
Networks are engineered for performance with PoE switching, VLAN/QoS, Wi-Fi heat maps, and secure remote access.
AV systems include in-ceiling/in-wall speakers, amps, DSP, control UIs, HDBaseT/AV-over-IP, and full audio/video calibration.
Studios are built for isolation and accuracy—double-stud or resilient assemblies, clouds and traps, Dante/patchbays, and monitor alignment to target SPL/RT60.
We also frame niches and bays, re-board precisely, and deliver Level 4–5 drywall finishes that hide every cable path.
Each project follows a tight sequence: assess, design, pre-build, install/program, test/certify, close/finish, and train/hand over.
You receive as-builts, rack elevations, IO/patch and IP maps, plus Fluke/OTDR and acoustic calibration reports for proof of performance.
Based in Toronto, we serve the GTA and take select projects beyond; send a floor plan or room sketch for a same-day ballpark and a fixed quote after the site survey.

Home Theatre Boardrooms, hospitality, retail, gyms, content rooms, engineered systems, clean infrastructure, Level 4 finishes. Provide floor plans and decision realistic timelines; we’ll deliver a phased proposal with risk, schedule, and cost controls.

 

What We Need (to quote fast)

  • Address and access notes

  • Floor plan or room sketch (PDF preferred)

  • Goals by area (AV, network, security, studio, drywall)

  • Desired completion date and site constraints

  • Budget bracket: $, $, or $__+

  • Decision maker and procurement process

 

What You Get

  • Design assessment and scope outline

  • Budget range with alternates (good/better/best)

  • Lead time and critical path

  • Deliverables list (as-builts, test reports, calibration)

  • Next steps and scheduling window

Thanks for submitting!

bottom of page